Do check checklist such as water leaking testing,all mobile compenents. At the same time, a complete mould documents will be shipped together with moulds(2D&3D drawings,BOM part list,MF report,mold operation book,steel certificate,mould checklist,trial reports/videos,electrodes mold pictures etc.)